Back

This is the date for the operation of the Trans-Saharan Gas Pipeline Project

March 31, 2026اقتصاد – الشروق أونلاينechoroukonline.com
This is the date for the operation of the Trans-Saharan Gas Pipeline Project

The Secretary General of the African Petroleum Producers Organization, Farid Ghazali, expects the full and actual operation of the Trans-Saharan Gas Pipeline Project to begin in early 2029, in a statement he gave to the 'Algeria International' channel. Ghazali also praised Algeria's strategic contribution and its institutions in developing the gas sector in Africa and the region, and its leading role in liquefied natural gas production. Watch the full content on Echourouk Online.

Share on social media

Related Articles

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

The President of the Republic, Abdelmadjid Tebboune, delivered a speech to the participants at the opening of the COP31 summit, held in Antalya, Turkey, which was read by Prime Minister Aïmene Benabderrahmane. The President emphasized that collective efforts to address climate change remain below the required level, noting that the funding gap is as wide as the gap recorded in emission reductions, which necessitates making this conference a practical station for implementation and fulfilling commitments.

Nov 12, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.