Back

Eastern Mining Line: Djilawi Pleased with Project Progress

April 9, 2026اقتصاد | الإذاعة الجزائريةradioalgerie.dz
Eastern Mining Line: Djilawi Pleased with Project Progress

The Minister of Public Works and Infrastructure, Abdelkader Djilawi, expressed his satisfaction on Thursday night regarding the progress of several sections of the Eastern Mining Line. This came during an inspection that continues until this Friday, to assess the progress of the project (422 kilometers) extending along the Annaba - Tebessa axis. Djilawi's visit was part of an inspection of various sections being constructed in the provinces of Tebessa, Souk Ahras, Guelma, El Tarf, and Annaba.

Share on social media

Related Articles

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

The President of the Republic, Abdelmadjid Tebboune, delivered a speech to the participants at the opening of the COP31 summit, held in Antalya, Turkey, which was read by Prime Minister Aïmene Benabderrahmane. The President emphasized that collective efforts to address climate change remain below the required level, noting that the funding gap is as wide as the gap recorded in emission reductions, which necessitates making this conference a practical station for implementation and fulfilling commitments.

Nov 12, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.