Back

Fouka 2 seawater desalination plant returns to full production capacity after maintenance work completion

April 3, 2026اقتصاد | الإذاعة الجزائريةradioalgerie.dz
Fouka 2 seawater desalination plant returns to full production capacity after maintenance work completion

The Algerian Water Desalination Company, a subsidiary of SONATRACH, announced in a statement today, Friday, the return of the Fouka 2 seawater desalination plant to service at full production capacity. The statement said: "The Algerian Water Desalination Company, a subsidiary of SONATRACH, informs that the scheduled periodic maintenance work at the Fouka 2 seawater desalination plant in Tipaza has been completed." Accordingly, the plant has entered into service and is currently operating at full production capacity, according to the same source, which is 300,000 m3/day, under normal operating conditions "ensuring the continuity of water supply."

Share on social media

Related Articles

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

The President of the Republic, Abdelmadjid Tebboune, delivered a speech to the participants at the opening of the COP31 summit, held in Antalya, Turkey, which was read by Prime Minister Aïmene Benabderrahmane. The President emphasized that collective efforts to address climate change remain below the required level, noting that the funding gap is as wide as the gap recorded in emission reductions, which necessitates making this conference a practical station for implementation and fulfilling commitments.

Nov 12, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.