Back

Project to Supply the Phosphate Complex with 3 Million Cubic Meters of Industrial Water Annually

April 25, 2026اقتصاد – الشروق أونلاينechoroukonline.com
Project to Supply the Phosphate Complex with 3 Million Cubic Meters of Industrial Water Annually

The Minister of Water, Lounes Bouzegza, launched a project to supply the integrated phosphate extraction complex in El Hadba, Tebessa, with industrial water, with a supply capacity estimated at about 3 million cubic meters annually, with directives to reduce the completion period from 12 to 9 months by strengthening work sites, due to its strategic importance in supporting investment. The minister explained yesterday, Friday, that the project involves transporting water over a distance of up to 150 kilometers starting from the municipality of Firkan, as part of enhancing water capacities directed towards major projects and supporting the infrastructure related to the industrial sector. Watch the full content on Echourouk Online.

Share on social media

Related Articles

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

The President of the Republic, Abdelmadjid Tebboune, delivered a speech to the participants at the opening of the COP31 summit, held in Antalya, Turkey, which was read by Prime Minister Aïmene Benabderrahmane. The President emphasized that collective efforts to address climate change remain below the required level, noting that the funding gap is as wide as the gap recorded in emission reductions, which necessitates making this conference a practical station for implementation and fulfilling commitments.

Nov 12, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.