Back

Chad launches with SONELGAZ the preparatory phase for a 40 MW power station

May 12, 2026اقتصاد – الشروق أونلاينechoroukonline.com
Chad launches with SONELGAZ the preparatory phase for a 40 MW power station

The Prime Minister of the Republic of Chad, Alain-Goma Halina, received a delegation of SONELGAZ experts in the capital N'Djamena, as part of the launch of the preparatory phase for the construction of a 40 MW power generation station, within the framework of efforts to enhance energy cooperation between Algeria and Chad. A statement from the public group clarified that the meeting took place yesterday, Monday, in the presence of several members of the Chadian government, alongside the Algerian ambassador to Chad, and comes in line with the directives of President Abdelmadjid Tebboune aimed at strengthening African cooperation and promoting South-South partnerships. Read the full content on Echourouk Online.

Share on social media

Related Articles

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

The President of the Republic, Abdelmadjid Tebboune, delivered a speech to the participants at the opening of the COP31 summit, held in Antalya, Turkey, which was read by Prime Minister Aïmene Benabderrahmane. The President emphasized that collective efforts to address climate change remain below the required level, noting that the funding gap is as wide as the gap recorded in emission reductions, which necessitates making this conference a practical station for implementation and fulfilling commitments.

Nov 12, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.