Back

Accelerated work with enhanced workshops in equipment and manpower

July 8, 2026APS | سكن وبنى تحتيةaps.dz
Accelerated work with enhanced workshops in equipment and manpower

Algeria - The Ministry of Public Works and Infrastructure confirmed today, Wednesday, in a statement that the pace of work on the expansion project of the Annaba phosphate port, which includes the construction of a mining dock as part of the integrated phosphate project, is witnessing rapid progress, with the enhancement of workshops with equipment and human resources during the months of July and August to expedite completion and ensure delivery of the project within the specified deadlines.

Share on social media

Related Articles

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

The President of the Republic, Abdelmadjid Tebboune, delivered a speech to the participants at the opening of the COP31 summit, held in Antalya, Turkey, which was read by Prime Minister Aïmene Benabderrahmane. The President emphasized that collective efforts to address climate change remain below the required level, noting that the funding gap is as wide as the gap recorded in emission reductions, which necessitates making this conference a practical station for implementation and fulfilling commitments.

Nov 12, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.