Back

Gara Djebilet Mine.. Study of the South-South Water Transfer Project Enters Its Final Phase

July 11, 2026اقتصاد – الشروق أونلاينechoroukonline.com
Gara Djebilet Mine.. Study of the South-South Water Transfer Project Enters Its Final Phase

The third and final phase of the study work for the South-South water transfer project linking the provinces of Tamanrasset and Tindouf with the Gara Djebilet area has reached a completion rate of 70%, and is still progressing at a regular pace. The project study office director, Farid Djilali, stated in a statement to the Algerian News Agency that the first and second phases of the study have been completed. View the full content on Echourouk Online.

Share on social media

Related Articles

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

The President of the Republic, Abdelmadjid Tebboune, delivered a speech to the participants at the opening of the COP31 summit, held in Antalya, Turkey, which was read by Prime Minister Aïmene Benabderrahmane. The President emphasized that collective efforts to address climate change remain below the required level, noting that the funding gap is as wide as the gap recorded in emission reductions, which necessitates making this conference a practical station for implementation and fulfilling commitments.

Nov 12, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.