Back

Inspection of the progress of work on the section linking Bouchakouf and El-Draïa

July 8, 2026APS | سكن وبنى تحتيةaps.dz
Inspection of the progress of work on the section linking Bouchakouf and El-Draïa

Algeria - Work continues on the Eastern Mining Line project, particularly on the section linking Bouchakouf (Guelma) and El-Draïa (Souk Ahras) with a length of 121 km, which was the subject of a field visit conducted by a delegation from the National Agency for Studies and Monitoring of Investment Projects in Railways, where instructions were given to mobilize all resources to increase the pace of completion of this strategic project, according to a statement issued today, Wednesday, by the Ministry of Public Works and Basic Infrastructure.

Share on social media

Related Articles

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

The President of the Republic, Abdelmadjid Tebboune, delivered a speech to the participants at the opening of the COP31 summit, held in Antalya, Turkey, which was read by Prime Minister Aïmene Benabderrahmane. The President emphasized that collective efforts to address climate change remain below the required level, noting that the funding gap is as wide as the gap recorded in emission reductions, which necessitates making this conference a practical station for implementation and fulfilling commitments.

Nov 12, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.