Back

Integrated Phosphate.. Completion of Industrial Water Connection Projects Before the End of 2026

September 11, 2026اقتصاد – الشروق أونلاينechoroukonline.com
Integrated Phosphate.. Completion of Industrial Water Connection Projects Before the End of 2026

The Minister of Water Resources, Lounes Bouzguza, emphasized the necessity of completing the connection works for the integrated phosphate project in both El Hadba and Oued Kebrit with industrial water before the end of 2026, stressing the need to accelerate the pace of achievement and adhere to the applicable technical standards and specifications. This came during his chairing of a working session yesterday, Thursday, dedicated to monitoring the progress of the industrial water connection projects related to the project, where the minister stressed the need to intensify efforts and increase the pace of achievement, according to a statement from the Ministry of Water Resources. Read the full content on Echourouk Online.

Share on social media

Related Articles

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

The President of the Republic, Abdelmadjid Tebboune, delivered a speech to the participants at the opening of the COP31 summit, held in Antalya, Turkey, which was read by Prime Minister Aïmene Benabderrahmane. The President emphasized that collective efforts to address climate change remain below the required level, noting that the funding gap is as wide as the gap recorded in emission reductions, which necessitates making this conference a practical station for implementation and fulfilling commitments.

Nov 12, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.