Back

Integrated Phosphate Project: The Necessity of Completing Industrial Water Connection Projects Before the End of 2026

September 10, 2026اقتصاد | الإذاعة الجزائريةradioalgerie.dz
Integrated Phosphate Project: The Necessity of Completing Industrial Water Connection Projects Before the End of 2026

The Minister of Water Resources, Lounes Bouzguza, emphasized this Thursday the necessity of completing the connection works of the integrated phosphate project in both El Hadba and Oued Kebrit to industrial water before the end of 2026, according to a statement from the ministry. While presiding over a working session dedicated to monitoring the progress of the industrial water connection projects for this project, Mr. Bouzguza stressed the need to accelerate the pace of completion and intensify efforts, while strictly adhering to the applicable technical standards and specifications, according to the same source.

Share on social media

Related Articles

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

The President of the Republic, Abdelmadjid Tebboune, delivered a speech to the participants at the opening of the COP31 summit, held in Antalya, Turkey, which was read by Prime Minister Aïmene Benabderrahmane. The President emphasized that collective efforts to address climate change remain below the required level, noting that the funding gap is as wide as the gap recorded in emission reductions, which necessitates making this conference a practical station for implementation and fulfilling commitments.

Nov 12, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.