Back

Repair of nearly 150 km of the damaged water network

September 5, 2026APS | تجارة وخدماتaps.dz
APS | تجارة وخدمات

Algeria - Approximately 150 kilometers (km) of the damaged segments of the drinking water supply network have been repaired, due to the fires that recently affected several provinces of the country, as revealed today, Saturday, in Algiers, by the Minister of Water Resources, Lounes Bouzguza, who confirmed the mobilization of all necessary human and material resources to ensure the continuity of the public water service and to address these areas.

Share on social media

Related Articles

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

The President of the Republic, Abdelmadjid Tebboune, delivered a speech to the participants at the opening of the COP31 summit, held in Antalya, Turkey, which was read by Prime Minister Aïmene Benabderrahmane. The President emphasized that collective efforts to address climate change remain below the required level, noting that the funding gap is as wide as the gap recorded in emission reductions, which necessitates making this conference a practical station for implementation and fulfilling commitments.

Nov 12, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.