Back

The unified window for the commercial port of Mostaganem will be operational soon

September 26, 2026اقتصاد – الشروق أونلاينechoroukonline.com
The unified window for the commercial port of Mostaganem will be operational soon

The unified window at the commercial port of Mostaganem is expected to become operational, according to a statement from the General Directorate of the Port Authority on Saturday. The source clarified that this window, which cost 215 million DZD to implement, aims to simplify procedures, enhance coordination among various stakeholders, reduce timelines, and improve reception and communication with economic operators. The project is 90 percent complete, awaiting the completion of the remaining minor works and its final delivery, the same source added. The General Directorate of the Port has decided to integrate laboratories belonging to executive directorates, such as trade, agriculture, and veterinary services, into this window, which will facilitate operations.

Share on social media

Related Articles

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

President Tebboune Presents Algeria's Plan to Reduce Emissions and Address Climate Change

The President of the Republic, Abdelmadjid Tebboune, delivered a speech to the participants at the opening of the COP31 summit, held in Antalya, Turkey, which was read by Prime Minister Aïmene Benabderrahmane. The President emphasized that collective efforts to address climate change remain below the required level, noting that the funding gap is as wide as the gap recorded in emission reductions, which necessitates making this conference a practical station for implementation and fulfilling commitments.

Nov 12, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.